Indore Elevated Corridor Project Upheld, with High-Level Technical Oversight Ordered
Court / Authority
Madhya Pradesh High Court
Update / Judgement Date
26 Oct 2026
Date of Publication
29 Oct 2026
Case No.
Writ Petition No. 3905 of 2026
Source
WCP News Bulletin
Author
Dipanshi Bansal — WCP Legal Desk
Reading Time
6 min read
View Count
7

The Madhya Pradesh High Court dismissed a public interest petition challenging the proposed 6.5-kilometre elevated corridor between L.I.G. Square and Navlakha Square in Indore. The Court recognised that the petitioner’s technical concerns were not wholly unfounded, but considered that separate flyovers at each intersection could create bottlenecks and provide no additional road space. Treating the choice of infrastructure as a policy decision absent established mala fides, illegality or arbitrariness, the Court declined to halt the project, directed disclosure of its total cost and expected completion timeline, and constituted a high-level technical committee to oversee construction. (Paras 33–44)
Key Proposition: Courts ordinarily will not interfere with a government infrastructure-policy choice absent established mala fides, illegality or arbitrariness, while appropriate directions may be issued for transparency and technical oversight.
- Public interest litigation – Urban infrastructure – Elevated corridor – Whether the project should be halted in favour of separate intersection flyovers – Held, petition dismissed after weighing competing technical claims. (Paras 33–42)
- Judicial review – Policy decision – Public expenditure – Whether the Court should substitute its technical view for the State’s project choice – Held, interference not warranted absent mala fides, illegality or arbitrariness. (Para 38)
- Urban traffic planning – Technical oversight and transparency – Whether safeguards should be ordered – Held, total project cost and completion timeline to be placed in the public domain and a high-level committee constituted. (Paras 38–41)
Background / Synopsis :
- The petitioner, a chartered engineer and social worker, filed a public interest petition challenging the proposed 6.5-kilometre elevated corridor from L.I.G. Square to Navlakha Square, Indore.
- The petitioner argued that surveys and feasibility studies showed limited utility for the corridor and favoured flyovers or grade separators at individual intersections. He sought a judicial committee and an order restraining construction.
- The State and supporting intervenor argued that the corridor would add four lanes above the existing six, provide additional capacity and address traffic growth. They disputed the petitioner’s interpretation of the technical material.
Full Judgement / Attachment